{"id":41816,"date":"2025-11-13T09:00:00","date_gmt":"2025-11-13T09:00:00","guid":{"rendered":"https:\/\/ocs.com\/uk\/?p=41816"},"modified":"2026-02-19T13:58:16","modified_gmt":"2026-02-19T13:58:16","slug":"delivering-low-carbon-heating-and-cooling-major-broadcast-facility","status":"publish","type":"post","link":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/","title":{"rendered":"Delivering Low-Carbon Heating and Cooling for a Major Broadcast Facility"},"content":{"rendered":"    <section \n        id=\"block_acf-block-699716f77c723\" \n        class=\"text-[#475467] prose-h1:font-semibold prose-h1:mb-10 prose-headings:font-medium prose prose-ocs prose-li:pl-0 w-full max-w-none\n        \"\n        style=\"background-color: #FFFFFF;\"\n    >\n        <h3>Project Overview<\/h3>\n<p class=\"p1\">A major broadcast organisation operates its primary studios from a critical broadcast and office facility with no tolerance for downtime. The site required a major decarbonisation upgrade to replace ageing gas boilers and chillers, while maintaining uninterrupted television and radio broadcasting throughout the programme.<\/p>\n<p class=\"p1\">The works formed part of the organisation\u2019s wider commitment to reducing operational energy use, cutting reliance on gas, lowering embodied and operational carbon, and protecting resilience for mission-critical services.<\/p>\n<h3>The Challenge<\/h3>\n<p class=\"p1\">Delivery took place within a live, always-on environment, where heating, cooling and domestic hot water systems support both building users and broadcast-critical infrastructure.<\/p>\n<p class=\"p1\">Key challenges included maintaining full system redundancy, coordinating complex mechanical and electrical isolations, and delivering major plant replacement works without disrupting studio operations, service yards, or satellite broadcast activity.<\/p>\n<p class=\"p1\">Low flow temperatures associated with air source heat pumps also constrained existing pipework, emitters and domestic hot water systems. Integration was required without widespread modification beyond the plantroom, placing additional emphasis on system design and sequencing.<\/p>\n    <\/section>\n\n\n    <section id=\"block_acf-block-699716f77c75d\" class=\"grid gap-10 lg:gap-4 grid-cols-1  lg:grid-cols-2 \">\n                    <div class=\"grid gap-4\">\n                <picture class=\"h-[400px]\">\n                    <source srcset=\"https:\/\/ucarecdn.com\/b0b19c91-ce82-4829-94e2-ff285a7241c2\/-\/format\/auto\/-\/quality\/smart\/-\/preview\/768x768\/\" media=\"(max-width: 640px)\" type=\"image\/jpg\">\n                    <source srcset=\"https:\/\/ucarecdn.com\/b0b19c91-ce82-4829-94e2-ff285a7241c2\/-\/format\/auto\/-\/quality\/smart\/-\/preview\/1024x1024\/\" type=\"image\/jpg\">\n                    <img decoding=\"async\" src=\"https:\/\/ucarecdn.com\/b0b19c91-ce82-4829-94e2-ff285a7241c2\/-\/format\/auto\/-\/quality\/smart\/-\/preview\/1024x1024\/\" class=\"w-full h-full object-cover object-center rounded-3xl\" alt=\"A confident worker in safety glasses, a white OCS helmet, and a yellow vest stands in an industrial setting, arms crossed, with machinery and pipes in the background.\">\n                <\/picture>\n\n                            <\/div>\n                            <div class=\"grid gap-4\">\n                <picture class=\"h-[400px]\">\n                    <source srcset=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-3-768x768.jpg\" media=\"(max-width: 640px)\" type=\"image\/jpg\">\n                    <source srcset=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-3-1024x1024.jpg\" type=\"image\/jpg\">\n                    <img decoding=\"async\" src=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-3-1024x1024.jpg\" class=\"w-full h-full object-cover object-center rounded-3xl\" alt=\"Red and black industrial pipes secured with metal brackets run parallel on a metal grate platform, surrounded by a metal framework and outdoor industrial equipment.\">\n                <\/picture>\n\n                            <\/div>\n            <\/section>\n\n\n    <section \n        id=\"block_acf-block-699716f77c7ae\" \n        class=\"text-[#475467] prose-h1:font-semibold prose-h1:mb-10 prose-headings:font-medium prose prose-ocs prose-li:pl-0 w-full max-w-none\n        \"\n        style=\"background-color: #FFFFFF;\"\n    >\n        <h3>Delivery Approach<\/h3>\n<p class=\"p1\">OCS delivered the programme through a fully self-managed mechanical and electrical installation, using a phased approach that enabled the progressive removal and replacement of existing boilers and chillers while keeping the building live at all times.<\/p>\n<p class=\"p1\">Works were planned in detail to protect continuity of service, with close coordination of mechanical and electrical isolations to maintain resilience for critical systems. Crane operations were carefully scheduled to avoid disruption to broadcasting logistics, including service yards and satellite activity.<\/p>\n<p class=\"p1\">Safety and programme efficiency were improved through approved alternative pipework solutions, including lightweight grooved stainless-steel pipework externally and medium-grade steel internally. These changes reduced manual handling risk, improved safety during installation around live plant, and shortened installation time without compromising system performance or compatibility.<\/p>\n<h3>Delivery Solution<\/h3>\n<p class=\"p1\">The programme included the removal of three 1,250 kW gas boilers, four 900 kW air-cooled chillers and associated gas-fired water heaters. These were replaced with simultaneous heating and cooling air source heat pumps delivering 779 kW of heating and 557 kW of cooling.<\/p>\n<p class=\"p1\">To address temperature limitations, water source heat pumps were integrated to raise low-temperature hot water from 55\u00b0C to 80\u00b0C for space heating and to 78\u00b0C for domestic hot water. This approach allowed the existing distribution systems beyond the plantroom to be retained.<\/p>\n<p class=\"p1\">The scope also included new buffer vessels, pumps, pressurisation units, BMS modifications, and electrical panel upgrades. Multiple major crane lifts were completed, including the installation of large plant and buffer vessels through the roof, all while the site remained fully operational and broadcasting.<\/p>\n    <\/section>\n\n\n    <section id=\"block_acf-block-699716f77c7d3\" class=\"grid gap-10 lg:gap-4 grid-cols-1  lg:grid-cols-2 \">\n                    <div class=\"grid gap-4\">\n                <picture class=\"h-[400px]\">\n                    <source srcset=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-2-768x768.jpg\" media=\"(max-width: 640px)\" type=\"image\/jpg\">\n                    <source srcset=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-2-1024x1024.jpg\" type=\"image\/jpg\">\n                    <img decoding=\"async\" src=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-2-1024x1024.jpg\" class=\"w-full h-full object-cover object-center rounded-3xl\" alt=\"Close-up of a metal pipe with bolts and red clamps in focus, while several people wearing yellow safety vests and hard hats stand blurred in the background at what appears to be a construction site.\">\n                <\/picture>\n\n                            <\/div>\n                            <div class=\"grid gap-4\">\n                <picture class=\"h-[400px]\">\n                    <source srcset=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-768x768.jpg\" media=\"(max-width: 640px)\" type=\"image\/jpg\">\n                    <source srcset=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-1024x1024.jpg\" type=\"image\/jpg\">\n                    <img decoding=\"async\" src=\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Hard-Services-BBC-1024x1024.jpg\" class=\"w-full h-full object-cover object-center rounded-3xl\" alt=\"A person wearing a high-visibility vest labeled OCS and a white hard hat walks along a gravel path between industrial buildings and metal pipes.\">\n                <\/picture>\n\n                            <\/div>\n            <\/section>\n\n\n    <section \n        id=\"block_acf-block-699716f77c83e\" \n        class=\"text-[#475467] prose-h1:font-semibold prose-h1:mb-10 prose-headings:font-medium prose prose-ocs prose-li:pl-0 w-full max-w-none\n        \"\n        style=\"background-color: #FFFFFF;\"\n    >\n        <h3>Outcome<\/h3>\n<p class=\"p1\">The project was delivered safely, compliantly and on programme within a 24-week delivery period, with no interruption to live broadcast operations.<\/p>\n<p class=\"p1\">The new low-carbon heating and cooling infrastructure is expected to reduce energy use by 27 per cent and building carbon emissions by 38 per cent compared with a 2019 baseline, delivering an anticipated saving of around 900 tonnes of CO\u2082.<\/p>\n<p class=\"p1\">By retaining existing distribution systems and maintaining full redundancy for critical services, the programme balanced decarbonisation ambition with operational resilience. The result is a future-ready energy system that supports the organisation\u2019s sustainability goals without compromising day-to-day performance.<\/p>\n<h3>Key Delivery Metrics<\/h3>\n<ul>\n<li><span data-contrast=\"auto\">Project value: \u00a32.6m<\/span><span data-ccp-props=\"{&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><span data-contrast=\"auto\">Programme duration: 24 weeks<\/span><span data-ccp-props=\"{&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><span data-contrast=\"auto\">Installed systems: Air source and water source heat pumps, upgraded BMS and electrical infrastructure<\/span><span data-ccp-props=\"{&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><span data-contrast=\"auto\">Operational status during works: Fully live, zero broadcast downtime<\/span><span data-ccp-props=\"{&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><span data-contrast=\"auto\">Carbon reduction: 38% versus 2019 baseline<\/span><span data-ccp-props=\"{&quot;335559739&quot;:0}\">\u00a0<\/span><\/li>\n<\/ul>\n    <\/section>\n\n\n    <section id=\"block_acf-block-699716f77c88f\" class=\"rounded-3xl\">\n        <div class=\"relative flex flex-col lg:flex-row-reverse \">\n                        <div class=\"relative w-full lg:w-1\/2 aspect-[3\/2] lg:h-auto rounded-t-3xl lg:rounded-tl-none lg:rounded-r-3xl\">\n                                    <div class=\"h-full lg:-ml-10\">\n                        <picture>\n                            <source srcset=\"https:\/\/ucarecdn.com\/8dcb8f3e-7899-4290-aced-12a076219fd5\/-\/format\/auto\/-\/quality\/smart\/-\/preview\/1024x1024\/\" type=\"image\/jpg\">\n                            <img decoding=\"async\" src=\"https:\/\/ucarecdn.com\/8dcb8f3e-7899-4290-aced-12a076219fd5\/-\/format\/auto\/-\/quality\/smart\/-\/preview\/1024x1024\/\" alt=\"Discover How OCS Delivers Low-Carbon Energy Upgrades in Complex, Live Environments\" class=\"object-cover w-full h-full rounded-t-3xl lg:rounded-l-none lg:rounded-r-3xl\" \/>\n                        <\/picture>\n                    <\/div>\n                            <\/div>\n            <div class=\"relative flex flex-col w-full lg:w-1\/2 gap-8 -mt-8 lg:mt-0 p-6 md:px-10 md:py-12 bg-ocs-orange-lightest rounded-3xl\"  style=\"background-color: #F7FBF7\" >\n                                                    <h2 class=\"text-ocs-gray-nav font-medium text-[28px] leading-[38px] text-crop\">\n                        Discover How OCS Delivers Low-Carbon Energy Upgrades in Complex, Live Environments                    <\/h2>\n                                                                        \n<a href=\"https:\/\/ocs.com\/uk\/services\/hard-services\/energy-services\/\" class=\"w-fit mt-4 lg:mt-0  relative inline-block text-[16px] px-5 py-3 rounded-full focus:outline-none focus-visible:ring-2 ring-ocs-black  btn-primary \"  target=\"_self\" >\n    OCS Energy Services <\/a>                            <\/div>\n        <\/div>\n    <\/section>\n","protected":false},"excerpt":{"rendered":"<p>OCS delivered a low-carbon heating and cooling upgrade at a major broadcast facility, reducing carbon emissions by 38% with zero operational downtime.<\/p>\n","protected":false},"author":62,"featured_media":10000025942,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[297,466,468],"tags":[311,469],"country":[],"class_list":["post-41816","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-services","category-energy-services-case-studies","category-media-broadcasting","tag-energy-services","tag-media-broadcasting"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Low-Carbon Heating Upgrade at Major Broadcast Facility - OCS - UK<\/title>\n<meta name=\"description\" content=\"OCS delivered low-carbon heating and cooling upgrade at a major broadcast facility, reducing carbon emissions by 38% with zero operational downtime.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Delivering Low-Carbon Heating and Cooling for a Major Broadcast Facility\" \/>\n<meta property=\"og:description\" content=\"OCS delivered low-carbon heating and cooling upgrade at a major broadcast facility, reducing carbon emissions by 38% with zero operational downtime.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"OCS - UK\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-13T09:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-19T13:58:16+00:00\" \/>\n<meta name=\"author\" content=\"lawrenceriches\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"lawrenceriches\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/\"},\"author\":{\"name\":\"lawrenceriches\",\"@id\":\"https:\/\/ocs.com\/uk\/#\/schema\/person\/1746bdec5f97a30eeecab411cc9b5465\"},\"headline\":\"Delivering Low-Carbon Heating and Cooling for a Major Broadcast Facility\",\"datePublished\":\"2025-11-13T09:00:00+00:00\",\"dateModified\":\"2026-02-19T13:58:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/\"},\"wordCount\":10,\"image\":{\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Media-Scotland.jpg\",\"keywords\":[\"Energy Services\",\"Media &amp; Broadcasting\"],\"articleSection\":[\"Energy Services\",\"Energy Services Case Studies\",\"Media &amp; Broadcasting\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/\",\"url\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/\",\"name\":\"Low-Carbon Heating Upgrade at Major Broadcast Facility - OCS - UK\",\"isPartOf\":{\"@id\":\"https:\/\/ocs.com\/uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Media-Scotland.jpg\",\"datePublished\":\"2025-11-13T09:00:00+00:00\",\"dateModified\":\"2026-02-19T13:58:16+00:00\",\"author\":{\"@id\":\"https:\/\/ocs.com\/uk\/#\/schema\/person\/1746bdec5f97a30eeecab411cc9b5465\"},\"description\":\"OCS delivered low-carbon heating and cooling upgrade at a major broadcast facility, reducing carbon emissions by 38% with zero operational downtime.\",\"breadcrumb\":{\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#primaryimage\",\"url\":\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Media-Scotland.jpg\",\"contentUrl\":\"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Media-Scotland.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/ocs.com\/uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Delivering Low-Carbon Heating and Cooling for a Major Broadcast Facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/ocs.com\/uk\/#website\",\"url\":\"https:\/\/ocs.com\/uk\/\",\"name\":\"OCS - UK\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/ocs.com\/uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/ocs.com\/uk\/#\/schema\/person\/1746bdec5f97a30eeecab411cc9b5465\",\"name\":\"lawrenceriches\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Low-Carbon Heating Upgrade at Major Broadcast Facility - OCS - UK","description":"OCS delivered low-carbon heating and cooling upgrade at a major broadcast facility, reducing carbon emissions by 38% with zero operational downtime.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/","og_locale":"en_GB","og_type":"article","og_title":"Delivering Low-Carbon Heating and Cooling for a Major Broadcast Facility","og_description":"OCS delivered low-carbon heating and cooling upgrade at a major broadcast facility, reducing carbon emissions by 38% with zero operational downtime.","og_url":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/","og_site_name":"OCS - UK","article_published_time":"2025-11-13T09:00:00+00:00","article_modified_time":"2026-02-19T13:58:16+00:00","author":"lawrenceriches","twitter_card":"summary_large_image","twitter_misc":{"Written by":"lawrenceriches","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#article","isPartOf":{"@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/"},"author":{"name":"lawrenceriches","@id":"https:\/\/ocs.com\/uk\/#\/schema\/person\/1746bdec5f97a30eeecab411cc9b5465"},"headline":"Delivering Low-Carbon Heating and Cooling for a Major Broadcast Facility","datePublished":"2025-11-13T09:00:00+00:00","dateModified":"2026-02-19T13:58:16+00:00","mainEntityOfPage":{"@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/"},"wordCount":10,"image":{"@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Media-Scotland.jpg","keywords":["Energy Services","Media &amp; Broadcasting"],"articleSection":["Energy Services","Energy Services Case Studies","Media &amp; Broadcasting"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/","url":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/","name":"Low-Carbon Heating Upgrade at Major Broadcast Facility - OCS - UK","isPartOf":{"@id":"https:\/\/ocs.com\/uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#primaryimage"},"image":{"@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Media-Scotland.jpg","datePublished":"2025-11-13T09:00:00+00:00","dateModified":"2026-02-19T13:58:16+00:00","author":{"@id":"https:\/\/ocs.com\/uk\/#\/schema\/person\/1746bdec5f97a30eeecab411cc9b5465"},"description":"OCS delivered low-carbon heating and cooling upgrade at a major broadcast facility, reducing carbon emissions by 38% with zero operational downtime.","breadcrumb":{"@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#primaryimage","url":"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Media-Scotland.jpg","contentUrl":"https:\/\/ocs.com\/app\/uploads\/2026\/02\/Media-Scotland.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/ocs.com\/uk\/news\/delivering-low-carbon-heating-and-cooling-major-broadcast-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ocs.com\/uk\/"},{"@type":"ListItem","position":2,"name":"Delivering Low-Carbon Heating and Cooling for a Major Broadcast Facility"}]},{"@type":"WebSite","@id":"https:\/\/ocs.com\/uk\/#website","url":"https:\/\/ocs.com\/uk\/","name":"OCS - UK","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ocs.com\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/ocs.com\/uk\/#\/schema\/person\/1746bdec5f97a30eeecab411cc9b5465","name":"lawrenceriches"}]}},"_links":{"self":[{"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/posts\/41816","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/users\/62"}],"replies":[{"embeddable":true,"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/comments?post=41816"}],"version-history":[{"count":10,"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/posts\/41816\/revisions"}],"predecessor-version":[{"id":42148,"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/posts\/41816\/revisions\/42148"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ocs.com\/uk\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/media?parent=41816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/categories?post=41816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/tags?post=41816"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/ocs.com\/uk\/wp-json\/wp\/v2\/country?post=41816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}